Menu

Executive Programs

Workshops

Projects

Blogs

Careers

Student Reviews



More

Academic Training

Informative Articles

Find Jobs

We are Hiring!


All Courses

Choose a category

Loading...

All Courses

All Courses

logo

TOPOSHEET Projects

Project 2
Objective:- To Develop a Hydraulic Model for a Major River selected from particular area using RAS Mapper tool of HEC-RAS. Calculating catchment area over a River reach of 10 Km and do flow calculations for the river using UH method. Considering Steady flow and Unsteady Flow analysis both and run the simulation…
  • DEM
  • GIS
  • HEC-RAS
  • Toposheet

Project submitted by -

submitdetails

Naitik

Know more
1.ans.:- Objective:- To Develop a Hydraulic Model for a Major River selected from particular area i.e. Entering cross sectional data, creating geometry of river, Calculating catchment area over a River reach of 10 Km and do flow calculations for the river using UH method. Considering Steady flow analysis and…
Objective: Developing a hydraulic model for river Periyar in Pindimana Panchayat in Ernakulam District in Kerala.  Only a small length of the river was considered in the project. The cross-section data and data for the UH method were unavailable,  the given values were used.  1. River Periyar (Google Earth…